Wednesday 6 September 2017

Oracle 1Z0-331 Question Answer

The Performance document has an approval step right after the Manager Evaluation step in a Performance process flow which also has a Self-Evaluation step. In the same performance, the option of “Evaluation activities can be performed concurrently” is selected. What happens to the document control when the approval task is triggered and the document approver rejects the approval request?

A. The control of the document comes to the worker’s Line Manager.
B. The control of the document comes to the worker.
C. The control of the document is open and whoever opens and saves the document first, the document is locked for that role.
D. The control of the document remains with the approver until the performance document is shared.

Answer: A


Which three options can be controlled by Performance Roles?

A. Competency Section
B. Questionnaire
C. Goals Section
D. Goals section rating scale
E. Competency section rating scale
F. Performance document period

Answer: B,C,F